![]() |
booooooooooooooooooost!!!
lol tbh even at like 150 itll fly BOOOOST!!!! |
new suspension now on handles alot better and steering is more positive, altho rear beam was properly seized altho mass hammer bashing by lee and blobby. So another go during the week at that, brakes need more caliper bolts and putting back together then they can go on to.
ax gti alloys going on during the week to, picking 16v up tommorow:D |
dont know if you want insparation but chek out my ax project thread or hes a couple of pics as a teaser and i really like that on the steels as well
![]() ![]() ![]() ![]() |
saw yours at dt few years back brian sounded nice when savalon had a go in it, shame that moose put it on its roof tho mate real shame.
Steelies are going mainly because tyres are scrap on them and I am getting some oe ax gti alloys with better rubber on more stealth |
really lol, where you there lol, what car did you have that day
|
erm to be honest I was probably in one of my 106s either quiksilver a diablo red gti or a blue flat arch ax cant remember lol
|
i cant remember that much of dt, apart from the 4 hour drive in a tin can with 1 seat
|
haha yeah oh well should be ok 16v end of january :D
Just looked at your thread yours rusted in same places mine did but not that bad has had everything done so all nice and solid |
wheels off, struts off in prep for new springs and bilsteins
![]() one of the completed struts ![]() The utterly gay twat bag rear beam which was seized solid no matter how much hammer time it did not budge even with lube. ![]() Good thing the front shocks were done pretty sure the woman last guy got the gti off knew the shockers were boned, not leaking but no response in them the rod just dropped when taken out didnt come back up, plus rear beam had been in parts before last guy got it aswell ecentric washers missing so part reason why its probably rusted up like the titanic. So plan of attack is take it back to lees in week to try and get it done, possibly swap the wheels over. Also need to order stuff to rebuild the 16v engine. But parts in possession pre converted 16v ax loom, 106 gti engine complete, locked ecu oe 421 manifold. Thats about it lads and lasses, got cheap cams to as you know |
Dont give up with the rear bar, when i lowered mine for the second time it took us, 4 men 90million cups of tea a lump hammer and 8 hours but it came out lol
|
![]() well another short update went to warrington and got the 16v engine and associated bits this morning and dropped it all off at the garage, so case of Lee sorts rebuild bits, gets head sent off for skim, get head back, bosh back together, get in car job done:D\ |
welcome home old french tin can.......
|
Need pics!!!!
|
So bargaintastic 16v engine complete loom ecu alt etc, gti front brakes, gti rad and lower hoses less than 3 figures ;)
also something may be happening by the weekend which means can pay for bodies in full :D so this will actually be on the road everything done by end of month |
these be the bee compressors
![]() big thanks to Josh "tanned man from Leicester" Preston, Scott "pot noodle" Morgan for the parts and Ryan "tall running man" Dinham for the noise inspiration ;) |
closed or open?
![]() ![]() |
Open for the noise!
|
it is tempting
|
Closed for protection - but trust me, the noise is still superb!!
|
open gav, you know it makes sence. :)
|
All times are GMT. The time now is 09:16. |
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.